| WGP 64 (09) - Combustion Turbines - Critical Losses and Trends | IMIA WGP64 | 2009 |
| WGP 63 (09) Risk Control and Claims Handling in ALoP Insurance | IMIA WGP63 | 2009 |
| WGP 62 (09) New Challenges for Wind Energy | IMIA WGP62 | 2009 |
| WGP 61 (09) - Mining Industry - Engineering Insurance Exposure | IMIA WGP61 | 2009 |
| WGP 60 (09) - Tunnel Boring Machines | IMIA WGP60 | 2009 |
| Bridges – Construction, Insurance and Risk Management | IMIA WGP59 | 2008 |
| CO2 Free Coal Combustion Technology – Influence on Insurance | IMIA WGP58 | 2008 |
| Desalination Plants – Technological development, Risks affecting Engineering Insurers and Claims Experience | IMIA WGP57 | 2008 |
| Deregulated Electricity Markets: Engineering Insurance BI Exposures related to Construction and Operation of Power Generation Plants | IMIA WGP56 | 2008 |
| Contingent BI in Engineering Insurance relevant - | IMIA WGP55 | 2008 |
| Water Distribution Systems in Buildings during Construction | IMIA WGP54 | 2007 |
| Rehabilitation Works and High Coverage Limits for Existing | IMIA WGP53 | 2007 |
| Emerging Technologies: Insuring what has not been insured before | IMIA WGP52 | 2007 |
| Revamping and modernisation of machinery and equipment | IMIA WGP51 | 2007 |
| Engineering Insurance Exposure related to Wet Risks | IMIA WGP50 | 2007 |
| Hazards in paper and pulp industries - from an engineering insurance perspective | IMIA WGP49 | 2006 |
| ALOP/DSU coverage for tunnelling risks? | IMIA WGP48 | 2006 |
| Break & Review | IMIA WGP47 | 2006 |
| Engineering Insurance Exposures related to the Construction of Roads | IMIA WGP46 | 2006 |
| Engineering Insurance of Offshore Wind Turbines | IMIA WGP45 | 2006 |
| Design Exclusion Wordings and Physical Loss or Damage | IMIA WGP44 | 2005 |
| Theft of Construction Plant | IMIA WGP43 | 2005 |
| Maintenance and Overhaul of Steam Turbines | IMIA WGP42 | 2005 |
| Engineering Exposure related to Aluminium Production | IMIA WGP41 | 2005 |
| EAR & CAR - Third Party Liability - Existing and Surrounding Property | IMIA WGP40 | 2005 |
| Steel Plants (part two): Loss Prevention Aspects | IMIA WGP39 | 2005 |
| Impact of increasing Natural Hazards on Engineering Insurance | IMIA WGP38 | 2004 |
| Steel Plants - Risk exposure and claims experience (part 1) | IMIA WGP37 | 2004 |
| Maintaining technical expertise in the insurance/reinsurance industry | IMIA WGP36 | 2004 |
| Monitoring of Large CAR/EAR Projects | IMIA WGP35 | 2004 |
| Insuring Utility Interruption - a Global View | IMIA WGP34 | 2004 |
| Analysis of Transformer Failures | IMIA WGP33 | 2003 |
| High Speed Railway Construction Projects | IMIA WGP32 | 2003 |
| Micro Gas Turbines, Risks and Market | IMIA WGP31 | 2003 |
| Construction and Operation of Hydro Power Dams and Plants | IMIA WGP30 | 2003 |
| Forensic Investigation of Engineering Claims | IMIA WGP29 | 2003 |
| Risk Management approaches in CAR/EAR projects | IMIA WGP28 | 2003 |
| Mold - Risk for Engineering Insurers? | IMIA WGP27 | 2003 |
| Insurance of Wind Turbines - Update | IMIA WGP26 | 2002 |
| Extension of the Period for Delay in Start Up Cover (DSU) | IMIA WGP25 | 2002 |
| Machinery Breakdown Risks of Nuclear Power Plants | IMIA WGP24 | 2002 |
| Telecommunications & e-Commerce - Global Exposures | IMIA WGP23 | 2002 |
| Use of Non-Destructive Testing (NDT) in Engineering Insurance | IMIA WGP22 | 2002 |
| The Pulp & Paper Industry - Technical Developments and Loss Experience | IMIA WGP21 | 2002 |
| Experience with Integrated Gasification Combined Cycle Power Projects (IGCC) | IMIA WGP20 | 2002 |
| PML Assessment of Civil Engineering Projects | IMIA WGP19 | 2002 |
| Tunnel Boring Machine (TBM) applications in soft ground conditions | IMIA WGP18 | 2001 |
| Risks associated with the construction and operation of Environmental Plant and Equipment | IMIA WGP16 | 2001 |
| The Role of the Engineer in the future of Engineering Insurance | IMIA WGP15 | 2001 |
| Inherent Defect Insurance | IMIA WGP14 | 2001 |
| Human Factors in Engineering Risk | IMIA WGP8 | 2000 |
| Large Gas Turbines-the Insurance Aspects (Update) | IMIA WGP13 | 2000 |
| The Internet and Intranet-Exposures and Insurable Interest | IMIA WGP12 | 2000 |
| Risk Control and Claims Handling in Advance Loss of Profits Insurance | IMIA WGP11 | 2000 |
| Insurance of Wind Turbines | IMIA WGP5 | 1999 |
| Insurance for Semiconductor Plants during Construction and Operation | IMIA WGP4 | 1999 |
| Managing Risk - Construction Insurance | IMIA WGP3 | 1999 |
| Catastrophe Modelling | IMIA WGP1 | 1999 |
| Defects Liability Cover, Construction Insurance | IMIA 6-59 | 1998 |
| Hydro Electric Power, Technical and Insurance Development | IMIA 16-71 | 1998 |
| Gas Turbines- Continuous Trend Towards Higher Performance | IMIA 16-70 | 1998 |
| Lender's Interest in Contractor's (Builder's Risk) Insurance | IMIA 6-55 | 1997 |
| Insurance of BOT Projects,Opportunities and Challenges | IMIA 16-67 | 1997 |
| New Developments in Advance Loss of Profits | IMIA 6-53 | 1996 |
| Failure of Large Oil Cooled Transformers | IMIA 16-66 | 1996 |
| Industrial Gas Turbine Development and Operating Experience | IMIA 16-59 | 1993 |