cause of loss
adverse weather
breakdown
- Collected Wind Turbine breakdown losses 2010
- blade damage in compressor of gas turbine_2007_31
- Damage to drying tumbler in chipboard factory_2007_27
- broken chipper in paper mill_2007_22
- blades damaged in gas_turbine
- loss of blades in steam_turbine
- cracked_rotor of bulb turbine generator
- guide_rolls_+ steam cylinders of paper machine
- disruption of_steam_roll
- Damage to rail bed service machine_2007_4
collapse
- CAR Collapse of diaphragm wall at metro project
- CECR Minneapolis bridge collapse disaster 2007_27slides
- Wheat Silo Collapse_2007_29
- collapse of grain silo
- collapse of highway bridge
- toppling mobile crane
- Collapse of pulp tower_2007_15
- water_reservoir_collapse damages IGCC power plant project
- Metro bridge collapse and crane failture - CAR_2010_38
- Collapse of chimney - CAR_2009_37
- Collapse of girder during bridge construction - CAR_2009_35
- Breakdown of bridge deck during launching ops - CAR_2009_34
- flooded sewage tunnel collapsed - CAR_2007_27
- heavy rain causes road collapse - CAR_2007_26
- Road collapse - CAR_2007
- Metro tunnel flooded - CAR_2007
- parking_lot collapsed - CAR
- tunnel_collapse - CAR
- subway_tunnel_collapse - CAR
- tunnel_boring destroys buildings due to collapse - CAR
- GP19 2010 Colognes Tube Tunnel Disaster
- SP17 2010 Collapse of Cooling Tower
corrosion
cracking
- cracks in ice cream making plant_2007_34
- Crack on Yankee dryer_2007_25
- Broken gear case of lime kiln_2007_24
- cracked lime kiln_2007_23
- guide roll caused damage to paper machine cylinders_2007_18
- cracked_rotor of bulb turbine generator
- crack in a Kaplan turbine blade
- Broken track cable of cable car_2008_1
defective material
- EAR-DSU due to condenser tubes bursting
- blade damage in compressor of gas turbine_2007_31
- damage to steam turbine in paper mill_2007_19
- Faulty material or workmanship at boiler_2008_17
- heavy_duty_gas_turbine
- Defective grout of foundation for bridge pylons - CAR_2008_32
- Bored pile wall tilted at harbour construction - CAR_2008_31
- outfall structure damaged at harbour constr - CAR_2008_29
earthquake
explosion
- IAR - Gas turnine and boiler explosion at IGCC PPl 2008
- IAR Explosion loss at chip board factory 2006
- Steamturbine disruption in refuse burning power plant_2011_37
- Explosion in odorous gas collection system_2007_26
- explosion in the dissolving tank of black liquor boiler_2007_21
- explosion in recovery boiler_2007_17
- explosion of steam pressure vessel
- disruption of_steam_roll
- Explosion in particle board factory_2010_3
- Explosion_in_precipitator
- SP16 2010 Fire and Explosion in Particle board factory
external causes
faulty design
- CAR Collapse of diaphragm wall at metro project
- wind turbine losses_2007_28
- Broken gear case of lime kiln_2007_24
- locomotive_traction transformers
- bucket_wheel excavator during erection
- drainage_culvert flooded - CAR
- Collapse of girder during bridge construction - CAR_2009_35
- Breakdown of bridge deck during launching ops - CAR_2009_34
- Bored pile wall tilted at harbour construction - CAR_2008_31
- retension wall of quay damaged - CAR_2008_30
- Road collapse - CAR_2007
- Metro tunnel flooded - CAR_2007
- coffer dam overtopped - CAR_2007
- parking_lot collapsed - CAR
- street_subsided near_pond - CAR
- coffer_dam_destruction at a hydro power plant - CAR
faulty operation
- implosion of heat storage vessel_2007_32
- broken chipper in paper mill_2007_22
- bearing failure on drying cylinder of paper machine_2007_16
- low water damage_to boiler_01
- Damage to rail bed service machine_2007_4
- Damage to boiler and evaporator frame_2009_22
- crane hits power cable of existing semiconductor plant
faulty workmanship
fire damage
- IAR Explosion loss at chip board factory 2006
- Various Wind Turbine Fire losses
- Steamturbine disruption in refuse burning power plant_2011_37
- Fire damage to loco diesel engine_2007_3
- fire in filament yarn production plant_2010_23
- Sawmill during extension works_2008_18
- fire_in chemical_vapour deposition system
- Fire during repair work on polypropylene pipes
- fire_damage to refractory lining od IGCC Power Plant_02
- fire damage to condominium - CAR
- formwork fire at_bridge construction - CAR
- cross liability claim due fire_damage - CAR_01
- fire_damage_at hotel complex - CAR
- fire_damage_at office block - CAR
- GP13 2009 Waste to Energie - Opportunities + Challenges
- SP06 2008 Fire Loss during Building Construction
flood damage
- floodwater_damage to electrical and electronic equipment
- Flood loss at semiconductor plant_2009_2
- plant and equipment washed into river bed
- gas pipeline flooded
- drainage_culvert flooded - CAR
- flooded sewage tunnel collapsed - CAR_2007_27
- heavy rain causes road collapse - CAR_2007_26
- Metro tunnel flooded - CAR_2007
- coffer dam overtopped - CAR_2007
- flood_damage to cofferdams at hydro power project CAR_01
hangslide
hurricane
impact
lightning
mold
natural hazards
- CECR Japans Tsunami Apocalypse March 2011
- 2015 present Catastrophy Adjusting Issues - Ramirez
- 2015 present Cat exposure to buildings 2015 - Reinoso s
- IMIA WGP 000(94-3) - Natural Hazards and Engineering Ins 12-18
- Hurricane loss to a Hotel Project
- 2007 Nakajima Global warming modelling
- 2006 Hotel Construction in the Caymans (hurricane)
- floodwater_damage to electrical and electronic equipment
- Flood loss at semiconductor plant_2009_2
- storm damage at harbour
- plant and equipment washed into river bed
- tornado damage to wind turbine_2005_12
- oil storage tanks due to storm
- gas pipeline flooded
- storm damages tetrapods at harbour protection - CAR_2008_28
- heavy rain causes road collapse - CAR_2007_26
- Landslide caused damage to road - CAR_2007
- hurricane damage to hotel project - CAR_2006
- flood_damage to cofferdams at hydro power project CAR_01
- GP05 2006 Hurricane Katrina
- SP15 2010 Earthquake Chile Feb 2010
- EP28-2007 Study of environmental change + global warming
- EP17-2003 Loss Potential of Natural Hazards
- IMIA WGP 000(99-1) Catastroph Modelling
- IMIA WGP 038 (04) Impact of increasing Natural Hazards
- IMIA WGP 050 (07) Exposure related to Wet Risks
negligence
overheating
overspeed
short circuit
storm
- Collected Wind Turbine breakdown losses 2010
- 2008 present Williams HeathrowT5
- IMIA WGP 000(96-3) - Design for earthquake and Wind -12-19
- Hurricane loss to a Hotel Project
- 2006 Hotel Construction in the Caymans (hurricane)
- storm damage at harbour
- EAR losses to offshore wind farm_2007_14
- tornado damage to wind turbine_2005_12
- oil storage tanks due to storm
- storm damages tetrapods at harbour protection - CAR_2008_28
subsidence
terrorism
theft
vibration
water damage
claims handling
- AP27 2016 War-and-terrorism By Richard Radevsky
- 2004 present Claims by Engineers - Problems that engineers encounter
- IMIA WGP 011 (00) AlOP Risk control and claims handling
- 2015 present Catastrophy Adjusting Issues - Ramirez
- 2015 Presentation of WGP 92(15) - Best Practice Claims Protocol - C Mueller
- IMIA WGP 000(90-2) - Repair Techniques 6-43
- IMIA WGP 000(97-5) Stress Corrosion Cracking 6-56
- IMIA WGP 000(97-4) Fatigue in Engineering Insurance
- IMIA WGP 083 (13) How can Engineering Insurers help reduce Loss
- 2013 Presentation of WGP 83(13) - How Engg Insurers can help reducing loss
- 2011 Presentation of IMIA WGP 73(11) - Reserving an Engineering Account
- GP05 2006 Hurricane Katrina
- GP04 2004 Alternative Dispute Resolution
- GP01 2004 Problems of Claims by Engineers
- SP21 2011 Repair of Arc furnace Transformer
- SP16 2010 Fire and Explosion in Particle board factory
- SP11 2009 Settlement of Hangslide Claim
- SP10 2009 Damage to Scrubber during construction
- SP01-2008 Handling of Cracks on Cement Mils
- EP42-2009 Equisales Associates - Transformer Case Study
- EP30-2008 Assessment of Turbogenerator Risk Levels
- EP29-2008 Oil-insulated Power Transformers
- IMIA WGP 000(96-1) Failure of Large Oil Cooled Transformers - 16-66
- IMIA WGP 000(99-1) Catastroph Modelling
- IMIA WGP 033 (03) Analysis of Transformer Failures
- IMIA WGP 064 (09) Combustion Turbines: Critical Losses and Trends
law and jurisdiction
risk management loss prevention
No results found.
technology industry
aluminium production
boilers
- IAR - Gas turnine and boiler explosion at IGCC PPl 2008
- IMIA WGP 095(16) - Supercritical-boilers-v4
- explosion in the dissolving tank of black liquor boiler_2007_21
- explosion in recovery boiler_2007_17
- overheating of fire tube boiler
- explosion of steam pressure vessel
- low water damage_to boiler_01
- Damage to boiler and evaporator frame_2009_22
- Faulty material or workmanship at boiler_2008_17
- Explosion_in_precipitator
- EP34-2008 German Version of WGP 58 (08) CO2-free Coal Combustion
- EP07_2003 Qualified Boiler Inspection
- IMIA WGP 058 (08) CO2 Free Coal Combustion Technology
bridges
- CECR Minneapolis bridge collapse disaster 2007_27slides
- 2009 present BridgeLossViaduct (s)
- collapse of highway bridge
- Metro bridge collapse and crane failture - CAR_2010_38
- Collapse of girder during bridge construction - CAR_2009_35
- Breakdown of bridge deck during launching ops - CAR_2009_34
- damage to temporary bridge support - CAR_2008_33
- Defective grout of foundation for bridge pylons - CAR_2008_32
- formwork fire at_bridge construction - CAR
- SP09 2009 Unique Bridge construction over Moskva River
- SP08 2009 Launching Girders-Checklist
buildings
- CECR Japans Tsunami Apocalypse March 2011
- 2015 present Cat exposure to buildings 2015 - Reinoso s
- Presenation of WG paper 54 (07) Water Distribution Systems in
- fire damage to condominium - CAR
- fatal injury TPL at residential building - CAR_2005
- parking_lot collapsed - CAR
- cross liability claim due fire_damage - CAR_01
- tunnel_boring destroys buildings due to collapse - CAR
- SP14 2010 Timber Framed Construction
- SP06 2008 Fire Loss during Building Construction
- EP47-2012 Building Construction PML Paper
- IMIA WGP 054 (07) Water Distribution Systems in Buildings during Construction
- IMIA WGP 053 (07) Rehabilitation Works and High Coverage Limits for Existing Property
cement mills
chip board factories
combined cycle power plants
- IAR - Gas turnine and boiler explosion at IGCC PPl 2008
- EAR-DSU due to condenser tubes bursting
- IMIA WGP 091(15) CCPP Combined Cycle Power Plants
- damage of gas turbine generator transformer
- pipe rack due to impact at IGCC power plant_2009_19
- EP08-2003 Condition Monitoring for new Gas Turbines
- IMIA WGP 000(93-1) Development of Industrial Gas Turbines - 06-59
- IMIA WGP 000(98-2) Trends in Gas Turbine Performance - 16-70
- IMIA WGP 013 (00) Large Gas Turbines
- IMIA WGP 020 (02) Integrated Gasification Combined Cycle Power Projects / IGCC
- IMIA WGP 064 (09) Combustion Turbines: Critical Losses and Trends
Contractors Plant / Cranes
- 2013 present Tower Cranes s
- EP48 + GP32 2013 Tower Cranes
- plant and equipment washed into river bed
- toppling mobile crane
- bucket_wheel excavator during erection
- crane hits power cable of existing semiconductor plant
- Metro bridge collapse and crane failture - CAR_2010_38
- GP09 2008 Theft of Contractors Plant in the UK
- EP44-2010 Plant Theft Report UK vers 4
- IMIA WGP 043 (05) Theft of Construction Plant and Equipment
dams
desalination plants
Electronic Equipment / Telecommunication
- floodwater_damage to electrical and electronic equipment
- stepper machine dropped during unloading_1999_13
- GP21 2011 Insurance Model for Data
- EP46-2012 Cyber Security - LPB224 pg5
- EP19-2003 Data Losses by Computer Viruses
- EP13a-2003 What is The Real Threat in Telecommunication
- EP13-2003 Telecommunications Equipment
- EP02 2002 Computer Crime
- EP01-2002 E-Commerce_crime_and_vandalism
- IMIA WGP 023 (02) Telecommunication and e-Commerce - Global Exposures
gas turbines
- IAR - Gas turnine and boiler explosion at IGCC PPl 2008
- 1996 present Advanced Gas Turbines - Keith Johnson WPG
- EP50-PowerGen_2014_GT_Validation Final
- blade damage in compressor of gas turbine_2007_31
- blades damaged in gas_turbine
- Rotor of a gas turbine_2008_16
- heavy_duty_gas_turbine
- EP30-2008 Assessment of Turbogenerator Risk Levels
- EP12-2003 Turbine Optimisation to manage Breakdown Risk
- EP08-2003 Condition Monitoring for new Gas Turbines
- EP05-2003 Non-destructive Examination of Turbines and Generators - NDT
- IMIA WGP 000(93-1) Development of Industrial Gas Turbines - 06-59
- IMIA WGP 000(98-2) Trends in Gas Turbine Performance - 16-70
- IMIA WGP 013 (00) Large Gas Turbines
- IMIA WGP 031 (03) Micro Gas Turbins, Risks and Markets
- IMIA WGP 064 (09) Combustion Turbines: Critical Losses and Trends
generators
harbours
high rise buildings
hydro power plants
- IMIA-WGP-114-19-Underground-Exposures-for-Hydroelectric-Plants
- Presentation of WGP 127 (22) Insuring Hydrogen - Isidro Pimental, Carl Dill & Frandco D'Andrea
- IMIA Insight Hydrogen
- MB Sayano Hydro Power accident 2009
- 2012 present Hydro Power Plants Brazil_Belloube s
- 2007 (14) Hydro Power Project Ecuador TBM
- cracked_rotor of bulb turbine generator
- crack in a Kaplan turbine blade
- mudslide damages hydro power plant
- flood_damage to cofferdams at hydro power project CAR_01
- coffer_dam_destruction at a hydro power plant - CAR
- GP31 2012 Hydro Power in Brazil
- IMIA WGP 000(98-1) Hydro-Electric Power - 16-71
new technologies
- IMIA WGP 095(16) - Supercritical-boilers-v4
- 2007 Presentation of WG Paper 52 (07) Emerging Technologies
- 2010 Presentation of WGP 67 - Fast Developing Technology
- SP19 2010 Powering Change - Post Magazine - 22 11 10
- EP37-2009 Technological Innovation and Insurance Support
- EP34-2008 German Version of WGP 58 (08) CO2-free Coal Combustion
- IMIA WGP 000(98-3) Defects Liability Cover, Construction Insurance - 06-59
- IMIA WGP 015 (01) The Role of the Engineer in the Future of Engineering Insurance
- IMIA WGP 052 (07) Insuring Emerging Technologies
- IMIA WGP 058 (08) CO2 Free Coal Combustion Technology
- IMIA WGP 067 (10) Fast developing Technology
nuclear power plants
offshore wind farms
- Wind Turbine lightning and hail losses 2010
- 2006 present Off Shore risks (Item 11)
- EP52_2014 Offshore Code of Practice vds_3549 English
- EP52_2014 Offshore Code of Practice vds_3549 German
- 2014 present Introduction to new Offshore Code of Practice
- EAR losses to offshore wind farm_2007_14
- SP25 2012 Offshore Wind Analysis - GenRe
oil gas industry
ore processing
other production plants
- cracks in ice cream making plant_2007_34
- Electric solenoid coil in chicken hatchery_2007_33
- implosion of heat storage vessel_2007_32
- Wheat Silo Collapse_2007_29
- steam leak damaged sulphuric_acid plant
- floodwater_damage to electrical and electronic equipment
- collapse of grain silo
- Sawmill during extension works_2008_18
- SP03 2008 Solar Module Production
power plants
- MB Sayano Hydro Power accident 2009
- EAR-DSU due to condenser tubes bursting
- SP28 2018 - RISK ASSESSMENT - ICS_SCADA SECURITY PROPERTY ENGINEERING POWER ENERGY
- 2010 present Managing Engineering risks (K Nix)
- IMIA WGP 091(15) CCPP Combined Cycle Power Plants
- GP33 2013 ALOP Claims Case - Air Preheater
- failure of power transformer_2007_35
- blade damage in compressor of gas turbine_2007_31
- blades damaged in gas_turbine
- loss of blades in steam_turbine
- crack in a Kaplan turbine blade
- Rotor of a gas turbine_2008_16
- mudslide damages hydro power plant
- bucket_wheel excavator during erection
- heavy_duty_gas_turbine
- GP31 2012 Hydro Power in Brazil
- GP18 2010 Managing Risks in a Power Company
- EP34-2008 German Version of WGP 58 (08) CO2-free Coal Combustion
- EP29-2008 Oil-insulated Power Transformers
- EP14-2003 Life Cycle Management - Utility Transformers
- EP12-2003 Turbine Optimisation to manage Breakdown Risk
- EP08-2003 Condition Monitoring for new Gas Turbines
- EP06-2003 What is Asset Management (Power Generation)
- IMIA WGP 000(93-1) Development of Industrial Gas Turbines - 06-59
- IMIA WGP 000(98-1) Hydro-Electric Power - 16-71
- IMIA WGP 000(98-2) Trends in Gas Turbine Performance - 16-70
- IMIA WGP 013 (00) Large Gas Turbines
- IMIA WGP 024 (02) Machinery Breakdown Risks of Nuclear Power Plants
- IMIA WGP 020 (02) Integrated Gasification Combined Cycle Power Projects / IGCC
- IMIA WGP 042 (05) Maintenance and Overhaul of Steam Turbines
- IMIA WGP 058 (08) CO2 Free Coal Combustion Technology
- IMIA WGP 064 (09) Combustion Turbines: Critical Losses and Trends
- IMIA WGP 075 (12) Construction of new Nuclear Power Plants
- IMIA WGP 074 (12) Contracted Power Generation Agreements
pulp and paper
- 2006 present Hazards in the Pulp and Paper Industry f
- Explosion in odorous gas collection system_2007_26
- Crack on Yankee dryer_2007_25
- Broken gear case of lime kiln_2007_24
- cracked lime kiln_2007_23
- broken chipper in paper mill_2007_22
- explosion in the dissolving tank of black liquor boiler_2007_21
- overheated lime kiln_2007_20
- damage to steam turbine in paper mill_2007_19
- guide roll caused damage to paper machine cylinders_2007_18
- explosion in recovery boiler_2007_17
- bearing failure on drying cylinder of paper machine_2007_16
- overheating damage_lime_kiln
- disruption of_steam_roll
- Collapse of pulp tower_2007_15
- IMIA WGP 049 (06) Hazards in Paper and Pulp Industries
railways other transportation systems
renewable energy
- IMIA WGP 127 (22) Insuring Hydrogen Infrastructure
- Hydrogen Presentation_June 2022
- IMIA Insight Hydrogen
- EP58 - Risk Control Practice Renewable Energy Handbook February 2021
- 2021 02 - Handbook Renewable Energy (2)
- wind turbine losses_2007_28
- EAR losses to offshore wind farm_2007_14
- tornado damage to wind turbine_2005_12
- GP20 2010 Innovative Solution for Managemt of Climate Change
- GP17 2010 Renewable Energies
- SP25 2012 Offshore Wind Analysis - GenRe
- SP19 2010 Powering Change - Post Magazine - 22 11 10
- SP03 2008 Solar Module Production
- EP43-2009 Wind turbines - Fire protection - vds 3523
- EP20-2003 Lecture on Fuel Cells
- EP18-2004 Renewable Endergies
- EP11-2003 The Changing Face of Windpower
- IMIA WGP 000(99-4) Insurance of Wind Turbines
residential buildings
roads
- 2006 present Road Construction 12
- 2015 present Collapse Motorway Tihuana 2015 - Kolbe
- 2014 Presentation of WGP 87(14) Access Roads
- Landslide damaged motorway during maintenance - CAR_2009_36
- heavy rain causes road collapse - CAR_2007_26
- Road collapse - CAR_2007
- Landslide caused damage to road - CAR_2007
- street_subsided near_pond - CAR
- SP11 2009 Settlement of Hangslide Claim
- IMIA WGP 046 (06) Exposures related to the Construction of Roads
semiconductor plants
solar cells
steam turbines
- Maintenance and Overhaul of Steam Turbines
- 2005 Presentation Maintenance_of_steam_turbines
- Steamturbine disruption in refuse burning power plant_2011_37
- damage to steam turbine in paper mill_2007_19
- loss of blades in steam_turbine
- EP30-2008 Assessment of Turbogenerator Risk Levels
- EP12-2003 Turbine Optimisation to manage Breakdown Risk
- EP05-2003 Non-destructive Examination of Turbines and Generators - NDT
- IMIA WGP 042 (05) Maintenance and Overhaul of Steam Turbines
steel plants
thermal power plants
- 2013 present ALOP Claims Case - Air Preheater
- IMIA WGP 095(16) - Supercritical-boilers-v4
- GP33 2013 ALOP Claims Case - Air Preheater
- loss of blades in steam_turbine
- Faulty material or workmanship at boiler_2008_17
- Explosion_in_precipitator
- Collapse of chimney - CAR_2009_37
- EP34-2008 German Version of WGP 58 (08) CO2-free Coal Combustion
- IMIA WGP 058 (08) CO2 Free Coal Combustion Technology