swiss re wordings
leg clauses london engineering group
- Lenders-clauses-by-LEG
- LEG Tunnel Works Clause Key Facts Doc June 2014
- LEG Tunnel Works Clause June 2014
- LEG - DSU-An-Overview 1358955726
- LEG - DSU-Introduction-Paper 1358955783
- LEG - Summary-DSU-London-Market-Working-Party1358935508
- GP34 2013 London DSU Working Group
- GP16 2010 The London Engineering Group LEG
aero engine insurance
boiler pressure vessel policy
cear insurance
- 14222 Directional Drilling - Exclusion
- 14219 Directional Drilling - Conditions
- 14218 Costs for Leak Search
- 14217 Open Trenches, Pipes, Cables and Ducts
- 14205 Hydrocarbon Processing Industries 2
- 14204 Hydrocarbon Processing Industries 1
- 14201 Guarantee Maintenance Cover
- 14121 Piling, Foundation and Retaining Wall Construction Work
- 14120 Liability consequent upon Vibration, Removal or Weakening of Support
- 14119 Property belonging to or held in the Care Custody or Control of the Insured
- 14118 Wet Risks
- 14117 Property Insured Taken Into Use or Operation
- 14116 Insured Contract Works Taken Over or Put Into Service
- 14115 Defective Part Only Exclusion
- 14113 Inland TRansit
- 14112 Fire Protection
- 14110 Loss Prevention in Respect of Flood and Inundation
- 14106 Section Lengths
- 14104 Dams and Water Reservoirs
- 14103 Crops Forests and Cultures
- 14102 Underground Services
- 14101Tunnels, Galleries and Underground Structures - LEG Tunnel Works Clause
- 14021 Plant Machinery and Equipment
- 14020 Multiple Insured Clause
- 14019 Radioactive Substances
- 14018 Professional Fees
- 14017 Marine 50-50 Loss Sharing
- 14016 Betterment Exclusion
- 14014 Outright Defects Exclusion
- 14013 Off-Site Storage
- 14012 Storm - Exclusion
- 14011 Serial Losses
- 14010 Flood or Inundation - Exclusion
- 14009 Earthquake - Exclusion
- 14008 Structures in Earthquake Zones
- 14007 Plans Documents and Data
- 14006 Expediting Expenses
- 14005 Costruction and-or Erection Time Schedule
- 14004 Extended Maintenance Cover
- 14003 Visits Maintenance Cover
- 14001 Strike, Riot and Civil Commotion
- MRe CEAR Clauses overview
- MRe CEAR insurance policy
munich re civil engineering completed risks
cpi clauses
- 1311 Customers extension
- 1375 Flue gas purification plants
- 1374 Sum insured on unit-price basis
- 1373 Inspection and overhauling of boilers
- 1372 Overhauling of steam, water and gas turbines and turbo-generator sets
- 1371 Overhauling of electric motors and generators above 1,000 kW (other than turbo-generators)
- 1370 Overhauling of platen presses
- 1369 Submerged and deep-well pumps
- 1368 Waiver of underinsurance
- 1367 Components along the hot-gas path of gas turbines
- 1366 Repairs to combustion engines (e.g. diesel, gas engines)
- 1365 Rewinding of electric machines (e.g. motors, generators, transformers)
- 1364 Wires and non-electric cables
- 1363 Conveyor belts and chains
- 1362 Refrigerant and lubricating oil
- 1361 Refractory materials and:or masonry in industrial furnaces and boilers
- 1360 Serial losses
- 1310 Suppliers’ extension
- 1309 Delay in repair
- 1308 Failure of public power, water, gas or steam supply
- 1307 Additional expenditure other than increased cost of working
- 1306 Maximum demand charges
- 1305 Prolongation of the interruption period due to deterioration
- 1304 Earthquake
- 1303 Business interruption resulting from machinery breakdown during a guarantee period
- 1302 Underground machinery and equipment
- 1301 Extra costs for airfreight
- 1300 Strike, riot and civil commotion
- CMI Policy
munich re car insurance standard clauses
- 121 Piling foundation and retaining wall works
- 120 Vibration, removal or weakening of support
- 119 Existing property
- 118 Drilling work for water wells
- 117 Laying water supply and sewer pipes
- 116 Contract works taken over or put into service
- 115 Designer’s risk
- 114 Serial losses
- 113 Inland transit
- 112 Fire-fighting facilities and fire safety on construction sites
- 111 Removal of debris from landslides
- 110 Safety measures with respect to precipitation, flood and inundation
- 109 Construction material
- 108 Construction plant, equipment and machinery
- 107 Camps and stores
- 106 Sections
- 104 Dams and water reservoirs
- 103 Crops, forests and cultures
- 102 Underground cables, pipes and other facilities
- 101 Tunnels, galleries, temporary or permanent subsurface structures or installations
- 100 Testing of machinery and installations
- 013 Property in off-site storage
- 012 Windstorm or wind-related water damage
- 010 Flood and inundation
- 009 Earthquake
- 008 Structures in earthquake zones
- 007 Extra charges for airfreight
- 006 Overtime, night work, night work on public holidays and express freight
- 005 Construction and:or erection time schedule
- 004 Extended maintenance
- 003 Maintenance visits
- 002 Cross liability
- 001 Strike, riot and civil commotion
- CAR_pol
mre car insurance standard clauses
No results found.
munich re contractors plant and machinery insurance
- CPM pol
- 421 Water Well Drilling Rigs and Equipment
- 420 Oil, Gas and:or Geothermal Drilling Rigs and Equipment
- 410 Adjustment of Sum Insured and Premium
- 401 Inland Transit
- 400 Underground Machinery and Equipment
- 007 Airfreight
- 006 Overtime, Night Work and Express Freight
- 001 Strike, Riot and Civil Commotion
mre cpi comprehensive project insurance
- 1270 Flue gas purification plants
- 1269 Marine 50:50 loss sharing
- 1268 Erection of storage tanks
- 1267 Serial losses
- 1266 Directional drilling
- 1265 Loss prevention in respect of flood and inundation
- 1264 Open trenches, pipes, cables and ducts
- 1263 Fire protection
- 1262 Underground services
- 1261 Structures in earthquake zones
- 1260 Contract time schedule
- 1250 Exclusion during the defects liability period
- 1249 Betterment
- 1248 Section lengths
- 1247 Limited cover during the defects liability period
- 1246 Hydrocarbon processing industries 2
- 1245 Hydrocarbon processing industries 1
- 1244 Marine and off-shore work
- 1243 Normal action of the sea
- 1242 Tunnels, galleries and underground structures
- 1241 Defective part only exclusion
- 1240 Outright faulty design exclusion
- 1239 Outright defects exclusion
- 1238 Piling, foundation and retaining wall construction work
- 1237 Drilling rigs and equipment
- 1236 Directional drilling
- 1235 Removal of debris
- 1234 Dams and water reservoirs
- 1233 Crops, forests and cultures
- 1232 Windstorm
- 1231 Flood or inundation
- 1230 Earthquake
- 1210 Delay in start-up following marine cargo
- 1209 Oil, gas and:or geothermal drilling rigs and equipment
- 1208 Costs for leak search
- 1207 Reactor pressure vessels with internals
- 1204 Guarantee maintenance 1205 Nuclear fuel elements 1206 Costs of decontamination
- 1203 Liability consequent upon vibration, removal or weakening of support
- 1202 Property insured taken into use or operation
- 1201 Extra costs for airfreight
- 1200 Strike, riot and civil commotion
- CPI Policy
- Description of Comprehensive Project insurance CPI
munich re deterioration of stock insurance
munich re ear standard insurance clauses
- 222 Exclusion of Horizontal Directional Drilling
- 221 Safety Measures with Respect to Inundation
- 220 Inland Transit
- 219 Horizontal Directional Drilling of Pipeline Routes
- 218 Leak Search Costs when Laying Pipelines
- 217 Open Trenches during Laying of Pipelines, Ducts and Cables
- 214 Subsidence
- 213 Reactor Pressure Vessel with Internals
- 212 Decontamination
- 211 Nuclear Fuel Elements
- 209 Crops, Forests and Cultures
- 208 Underground Cables and Pipes
- 207 Camps and Stores
- 206 Fire-Fighting Facilities
- 205 Hydrocarbon Processing Industries 2
- 204 Hydrocarbon Processing Industries 1
- 203 Used Machinery
- 202 Construction:Erection Machinery
- 201 Guarantee
- 200 Manufacturer’s Risk
- 013 Off-Site Storage
- 012 Exclusion of Windstorm
- 011 Serial Losses
- 010 Exclusion of Flood and Inundation
- 009 Exclusion of Earthquake
- 008 Structures in Earthquake Zones
- 007 Airfreight
- 006 Overtime, Night Work and Express Freight
- 005 Time Schedule
- 004 Extended Maintenance
- 003 Maintenance Visits
- 002 Cross Liability
- 001 Strike, Riot and Civil Commotion
munich re mlop insurance clauses
- 894 Sum Insured on Unit Price Basis
- 893 Proportional Time Excess
- 892 Indemnity Period Limits Exceeding 12 Months
- 891 Delay in Repair
- 866 Failure of Public Electricity, Water, Gas or Steam Supply
- 863 Additional Expenditure Other than Increased Cost of Working
- 862 Maximum Demand Charges
- 861 Increased Cost of Electricity, Water, Gas or Steam Supply
- 857 Prolongation of the Interruption Period due to Deterioration
- 856 Deterioration
- 855 Radioactive Isotopes in Instruments
- 845 Boilers
- 844 Steam, Water and Gas Turbines and Turbo-Generator Sets
- 843 Electric Motors and Generators
- 842 Non-Destructive Testing (NDT) of Presses, Shears and Similar Items with Highly Stressed Frames or Other Components
- 832 Flue Gas Explosions in Boilers and Furnaces
- 831 Inundation and Silting Up
- 829 Machinery Breakdown during Guarantee Period
- 817 Underground Machinery and Equipment
- 813 Internal Fire, Internal Chemical Explosion and Direct Lightning
- 812 Hull Risk - for Mobile Equipment including Inland Transit
- 811 Hull Risk - for Mobile Equipment on Premises only