advance loss of profits alop dsu
- Presentation of WGP 125 (21) Non-Damage Business Interruption and Delay in Start Up, Dieter Spaar
- EAR-DSU due to condenser tubes bursting
- IMIA WGP 011 (00) AlOP Risk control and claims handling
- IMIA WGP 000(93-4) - Advance Loss of Profits 6-48
- LEG - DSU-An-Overview 1358955726
- LEG - DSU-Introduction-Paper 1358955783
- LEG - Summary-DSU-London-Market-Working-Party1358935508
- GP34 2013 London DSU Working Group
- GP33 2013 ALOP Claims Case - Air Preheater
- Description of Advance Loss of Profits insurance ALoP
- coffer dam overtopped - CAR_2007
- GP08 2008 Liquidated Damages
- IMIA WGP 000(96-2) New Development in Advance Loss of Profits Insurance - 06-53
- IMIA WGP 025 (02) Extension of the Period of Delay in Start Up Cover / DSU
boiler and machinery mb
- MB Sayano Hydro Power accident 2009
- Claims 1999 MB Wind Farm Gears
- 1999 present Aging Plant review
- 1996 present Aging Plant Impact on MB Insurance s
- MB Damage in a Reverse Osmosis desalination plant
- Description of Machinery Insurance MB
- Steamturbine disruption in refuse burning power plant_2011_37
- Short-circuit of a transformer_2009_36
- failure of power transformer_2007_35
- cracks in ice cream making plant_2007_34
- Electric solenoid coil in chicken hatchery_2007_33
- implosion of heat storage vessel_2007_32
- blade damage in compressor of gas turbine_2007_31
- short circuit in power transformer_2007_30
- Wheat Silo Collapse_2007_29
- wind turbine losses_2007_28
- Damage to drying tumbler in chipboard factory_2007_27
- Explosion in odorous gas collection system_2007_26
- Crack on Yankee dryer_2007_25
- Broken gear case of lime kiln_2007_24
- cracked lime kiln_2007_23
- broken chipper in paper mill_2007_22
- explosion in the dissolving tank of black liquor boiler_2007_21
- overheated lime kiln_2007_20
- damage to steam turbine in paper mill_2007_19
- guide roll caused damage to paper machine cylinders_2007_18
- explosion in recovery boiler_2007_17
- bearing failure on drying cylinder of paper machine_2007_16
- overheating of fire tube boiler
- blades damaged in gas_turbine
- loss of blades in steam_turbine
- explosion of steam pressure vessel
- overheating damage_lime_kiln
- cracked_rotor of bulb turbine generator
- steam leak damaged sulphuric_acid plant
- locomotive_traction transformers
- damage of gas turbine generator transformer
- crack in a Kaplan turbine blade
- low water damage_to boiler_01
- guide_rolls_+ steam cylinders of paper machine
- disruption of_steam_roll
- floodwater_damage to electrical and electronic equipment
- Earth failure in high voltage generator
- SP17 2010 Collapse of Cooling Tower
bot privately financed projects
business interruption bi mlop
- 2016 presentation-BI-claims-issues-in-middle-east
- IMIA WGP 000(91-2) - Loss of profits risks
- EP49_2013 SCOR_FOCUS_on_CBI _Seminar _2013
- 2012 Presentation of WGP 74(12) - Insurance Coverage for Contracted Power Generation Agreements
- Description of Machinery Loss of Profits insurance MLoP
- GP08 2008 Liquidated Damages
- IMIA WGP 074 (12) Contracted Power Generation Agreements
civil engineering completed risks cecr
contingent business interruption cbi
contractors all risks car
No results found.
contractors plant and machinery cpm
- 2008 present Plant Theft Elliott 2
- EP48 + GP32 2013 Tower Cranes
- Theft of Construction Plant
- 2005 Presentation Theft_of_construction_plant
- Description of Contractors Plant and Machinery insurance CPM
- Damage to rail bed service machine_2007_4
- Fire damage to loco diesel engine_2007_3
- plant and equipment washed into river bed
- toppling mobile crane
customers suppliers extension
No results found.
cyber loss exclusion clauses
cyber risks
- Economic_impact_Cyber_loss_accumulation_scenarios_SVV
- Cyber Loss Limited Exclusion Clause - IUA 09-082
- Cyber Loss Exclusion Clauses - Commentary (1) IUA 09-081_082
- Cyber Loss Absolute Exclusion Clause - IUA 09-081
- SP28 2018 - RISK ASSESSMENT - ICS_SCADA SECURITY PROPERTY ENGINEERING POWER ENERGY
- Endorsement IMIA Cyber Exclusion 2018 short version and PD BI write-back 24-09-2018
- Endorsement IMIA Advanced Cyber Exclusion 2018 final 24-09-2018
- london-nov-16-silent-cyber-coverage-in
- cyber-workshosp_london_20161114
- cyber-power_energy_projects-open-seminar-london-imia-leg-opera
- 2016 presentation-of-WGP-98(16)-cyber-risks-in-engineering_doha_final
- EP46-2012 Cyber Security - LPB224 pg5
debris removal
decennial guarantee idi
descriptions of standard covers
- Description of Comprehensive Mechinery insurance CMI / IAR
- Description of Civil Engineering Completed Risks insurance CECR
- Description of Electronic Equipment insurance EEI
- Description of Deterioration of Stock insurance DOS
- Description of Machinery Loss of Profits insurance MLoP
- Description of Machinery Insurance MB
- Description of Boiler and Pressure Vessel insurance BPV
- Description of Contractors Plant and Machinery insurance CPM
- Description of Comprehensive Project insurance CPI
- Description of Advance Loss of Profits insurance ALoP
- Description of Mechanical Erstion All Risks insurance EAR
- Description of Contractors All Risks insurance CAR
- GP30 2012 How Defects Exclusions work in Practice
- IMIA WGP 000(97-2) Lenders Interest in Contractors Insurance - 06-55
design cover exclusions
- 2012 present Defects Excl - Rupert Travis
- 2011 present Design problems in tunnelling - advanta
- EP54_2017 AIG - Design-Engineering Costs, Prof Fees etc in CAR Policies
- IMIA WGP 000(96-3) - Design for earthquake and Wind -12-19
- Design Exclusion Wordings and Physical Loss or Damage
- 2005 Design Exclusion Wordings(DE1995_LEG 1996)
- GP30 2012 How Defects Exclusions work in Practice
- GP22 2011 Design Cover for unforeseen Ground Conditions
- EP45-2011 Systemic Causes in Geotechnical Works
- EP37-2009 Technological Innovation and Insurance Support
- IMIA WGP 000(93-1) Development of Industrial Gas Turbines - 06-59
- IMIA WGP 000(98-2) Trends in Gas Turbine Performance - 16-70
- IMIA WGP 000(98-3) Defects Liability Cover, Construction Insurance - 06-59
- IMIA WGP 044 (05) Design Exclusion Wordings (DE 1995 / LEG 1996)
- IMIA WGP 052 (07) Insuring Emerging Technologies
- IMIA WGP 067 (10) Fast developing Technology
electronic equipment insurance eei
- IMIA WGP 012 (00) Internet & intranet - exposures and insurable interests
- Endorsement IMIA Cyber Exclusion 2018 short version and PD BI write-back 24-09-2018
- Endorsement IMIA Advanced Cyber Exclusion 2018 final 24-09-2018
- 2011 present Data insurance Hans_Schols
- cyber-power_energy_projects-open-seminar-london-imia-leg-opera
- IMIA WGP 000(99-5) Claims arrising from Year 2000 Date
- IMIA WGP 000(95-4) - Computer Viruses + Implication on IMIA Mem16-65
- IMIA WGP 000(91-1) Electronic Equipment Insurance Status
- Description of Electronic Equipment insurance EEI
- GP21 2011 Insurance Model for Data
- EP46-2012 Cyber Security - LPB224 pg5
- EP19-2003 Data Losses by Computer Viruses
- EP13a-2003 What is The Real Threat in Telecommunication
- EP13-2003 Telecommunications Equipment
- EP02 2002 Computer Crime
- EP01-2002 E-Commerce_crime_and_vandalism
- IMIA WGP 023 (02) Telecommunication and e-Commerce - Global Exposures
entrepreneurial risks
industrial all risks iar
- CECR Japans Tsunami Apocalypse March 2011
- IAR - Gas turnine and boiler explosion at IGCC PPl 2008
- IAR Explosion loss at chip board factory 2006
- IMIA WGP 000(90-3) - All Risks Policies 6-42
- IMIA WGP 000(93-5) - Industral All Risks Cover 6-49
- Description of Comprehensive Mechinery insurance CMI / IAR
- Explosion in odorous gas collection system_2007_26
- Broken track cable of cable car_2008_1
- Explosion in particle board factory_2010_3
- Flood loss at semiconductor plant_2009_2
- SP16 2010 Fire and Explosion in Particle board factory
- IMIA WGP 049 (06) Hazards in Paper and Pulp Industries
inland transit
No results found.
lenders
maintenance covers
- Claims 1999 MB Wind Farm Gears
- MB Damage in a Reverse Osmosis desalination plant
- IMIA WGP 000(92-5) Garantee Insurances (mech-electrical)6-46
- Maintenance and Overhaul of Steam Turbines
- 2005 Presentation Maintenance_of_steam_turbines
- IMIA WGP 000(98-3) Defects Liability Cover, Construction Insurance - 06-59
- IMIA WGP 042 (05) Maintenance and Overhaul of Steam Turbines
mechanical constructionerection all risks ear
- EAR-DSU due to condenser tubes bursting
- Wind Turbine lightning and hail losses 2010
- IMIA WGP 081 (13) Annual Construction Policies
- Description of Mechanical Erstion All Risks insurance EAR
- fire in filament yarn production plant_2010_23
- Damage to boiler and evaporator frame_2009_22
- pipe rack due to impact at IGCC power plant_2009_19
- Sawmill during extension works_2008_18
- Faulty material or workmanship at boiler_2008_17
- Rotor of a gas turbine_2008_16
- Collapse of pulp tower_2007_15
- EAR losses to offshore wind farm_2007_14
- stepper machine dropped during unloading_1999_13
- tornado damage to wind turbine_2005_12
- mudslide damages hydro power plant
- oil storage tanks due to storm
- gas pipeline flooded
- bucket_wheel excavator during erection
- heavy_duty_gas_turbine
- waste treatment plant corroded at semiconductor plant
- damage_highspeed_train during testing
- crane hits power cable of existing semiconductor plant
- fire_in chemical_vapour deposition system
- Fire during repair work on polypropylene pipes
- Explosion_in_precipitator
- fire_damage to refractory lining od IGCC Power Plant_02
- overheating_motors at ore processing plant testing
- water_reservoir_collapse damages IGCC power plant project
- GP27 2011 Risk Engineering for construction projects
- GP12 2009 Silent Risks
- SP02 2008 TPL Risk evaluation for Contract Works
- EP33-2008 Safety on Construction Sites
- EP32-2008 Insuring Project and Contract Works (2)
- EP31-2008 Insuring Project and Contract Works (1)
- IMIA WGP 000(93-2) New Aspects of PML Estimation in CAR/EAR - 06-28
- IMIA WGP 028 (03) Risk Management Approaches in CAR/EAR Projects
natural hazards cover
- CECR Japans Tsunami Apocalypse March 2011
- 2015 present Catastrophy Adjusting Issues - Ramirez
- 2015 present Cat exposure to buildings 2015 - Reinoso s
- IMIA WGP 000(94-3) - Natural Hazards and Engineering Ins 12-18
- Hurricane loss to a Hotel Project
- 2007 Nakajima Global warming modelling
- 2006 Hotel Construction in the Caymans (hurricane)
- floodwater_damage to electrical and electronic equipment
- Flood loss at semiconductor plant_2009_2
- storm damage at harbour
- plant and equipment washed into river bed
- tornado damage to wind turbine_2005_12
- oil storage tanks due to storm
- gas pipeline flooded
- storm damages tetrapods at harbour protection - CAR_2008_28
- heavy rain causes road collapse - CAR_2007_26
- Landslide caused damage to road - CAR_2007
- hurricane damage to hotel project - CAR_2006
- flood_damage to cofferdams at hydro power project CAR_01
- GP05 2006 Hurricane Katrina
- SP15 2010 Earthquake Chile Feb 2010
- EP28-2007 Study of environmental change + global warming
- EP17-2003 Loss Potential of Natural Hazards
- IMIA WGP 000(99-1) Catastroph Modelling
- IMIA WGP 038 (04) Impact of increasing Natural Hazards
- IMIA WGP 050 (07) Exposure related to Wet Risks
project insurance cpi
surrounding existing property
terrorism
testing cover
third party liability tpl
- EAR/CAR Third Party liability-existing and surrounding property
- fatal injury TPL at residential building - CAR_2005
- settlement damage_to_business_center TPL - CAR
- cross liability claim due fire_damage - CAR_01
- tunnel_boring destroys buildings due to collapse - CAR
- SP02 2008 TPL Risk evaluation for Contract Works
- IMIA WGP 046 (06) Exposures related to the Construction of Roads