aluminium production
battery technology
boilers
- IAR - Gas turnine and boiler explosion at IGCC PPl 2008
- IMIA WGP 095(16) - Supercritical-boilers-v4
- explosion in the dissolving tank of black liquor boiler_2007_21
- explosion in recovery boiler_2007_17
- overheating of fire tube boiler
- explosion of steam pressure vessel
- low water damage_to boiler_01
- Damage to boiler and evaporator frame_2009_22
- Faulty material or workmanship at boiler_2008_17
- Explosion_in_precipitator
- EP34-2008 German Version of WGP 58 (08) CO2-free Coal Combustion
- EP07_2003 Qualified Boiler Inspection
- IMIA WGP 058 (08) CO2 Free Coal Combustion Technology
bridges
- CECR Minneapolis bridge collapse disaster 2007_27slides
- 2009 present BridgeLossViaduct (s)
- collapse of highway bridge
- Metro bridge collapse and crane failture - CAR_2010_38
- Collapse of girder during bridge construction - CAR_2009_35
- Breakdown of bridge deck during launching ops - CAR_2009_34
- damage to temporary bridge support - CAR_2008_33
- Defective grout of foundation for bridge pylons - CAR_2008_32
- formwork fire at_bridge construction - CAR
- SP09 2009 Unique Bridge construction over Moskva River
- SP08 2009 Launching Girders-Checklist
buildings
- CECR Japans Tsunami Apocalypse March 2011
- 2015 present Cat exposure to buildings 2015 - Reinoso s
- Presenation of WG paper 54 (07) Water Distribution Systems in
- fire damage to condominium - CAR
- fatal injury TPL at residential building - CAR_2005
- parking_lot collapsed - CAR
- cross liability claim due fire_damage - CAR_01
- tunnel_boring destroys buildings due to collapse - CAR
- SP14 2010 Timber Framed Construction
- SP06 2008 Fire Loss during Building Construction
- EP47-2012 Building Construction PML Paper
- IMIA WGP 054 (07) Water Distribution Systems in Buildings during Construction
- IMIA WGP 053 (07) Rehabilitation Works and High Coverage Limits for Existing Property
cement mills
chip board factories
combined cycle power plants
- IAR - Gas turnine and boiler explosion at IGCC PPl 2008
- EAR-DSU due to condenser tubes bursting
- IMIA WGP 091(15) CCPP Combined Cycle Power Plants
- damage of gas turbine generator transformer
- pipe rack due to impact at IGCC power plant_2009_19
- EP08-2003 Condition Monitoring for new Gas Turbines
- IMIA WGP 000(93-1) Development of Industrial Gas Turbines - 06-59
- IMIA WGP 000(98-2) Trends in Gas Turbine Performance - 16-70
- IMIA WGP 013 (00) Large Gas Turbines
- IMIA WGP 020 (02) Integrated Gasification Combined Cycle Power Projects / IGCC
- IMIA WGP 064 (09) Combustion Turbines: Critical Losses and Trends
contractors plant cranes
- 2013 present Tower Cranes s
- EP48 + GP32 2013 Tower Cranes
- plant and equipment washed into river bed
- toppling mobile crane
- bucket_wheel excavator during erection
- crane hits power cable of existing semiconductor plant
- Metro bridge collapse and crane failture - CAR_2010_38
- GP09 2008 Theft of Contractors Plant in the UK
- EP44-2010 Plant Theft Report UK vers 4
- IMIA WGP 043 (05) Theft of Construction Plant and Equipment
dams
desalination plants
electronic equipment telecommunication
- floodwater_damage to electrical and electronic equipment
- stepper machine dropped during unloading_1999_13
- GP21 2011 Insurance Model for Data
- EP46-2012 Cyber Security - LPB224 pg5
- EP19-2003 Data Losses by Computer Viruses
- EP13a-2003 What is The Real Threat in Telecommunication
- EP13-2003 Telecommunications Equipment
- EP02 2002 Computer Crime
- EP01-2002 E-Commerce_crime_and_vandalism
- IMIA WGP 023 (02) Telecommunication and e-Commerce - Global Exposures
gas turbines
- IAR - Gas turnine and boiler explosion at IGCC PPl 2008
- 1996 present Advanced Gas Turbines - Keith Johnson WPG
- EP50-PowerGen_2014_GT_Validation Final
- blade damage in compressor of gas turbine_2007_31
- blades damaged in gas_turbine
- Rotor of a gas turbine_2008_16
- heavy_duty_gas_turbine
- EP30-2008 Assessment of Turbogenerator Risk Levels
- EP12-2003 Turbine Optimisation to manage Breakdown Risk
- EP08-2003 Condition Monitoring for new Gas Turbines
- EP05-2003 Non-destructive Examination of Turbines and Generators - NDT
- IMIA WGP 000(93-1) Development of Industrial Gas Turbines - 06-59
- IMIA WGP 000(98-2) Trends in Gas Turbine Performance - 16-70
- IMIA WGP 013 (00) Large Gas Turbines
- IMIA WGP 031 (03) Micro Gas Turbins, Risks and Markets
- IMIA WGP 064 (09) Combustion Turbines: Critical Losses and Trends
generators
harbours
high rise buildings
hydro power plants
- IMIA-WGP-114-19-Underground-Exposures-for-Hydroelectric-Plants
- Presentation of WGP 127 (22) Insuring Hydrogen - Isidro Pimental, Carl Dill & Frandco D'Andrea
- IMIA Insight Hydrogen
- MB Sayano Hydro Power accident 2009
- 2012 present Hydro Power Plants Brazil_Belloube s
- 2007 (14) Hydro Power Project Ecuador TBM
- cracked_rotor of bulb turbine generator
- crack in a Kaplan turbine blade
- mudslide damages hydro power plant
- flood_damage to cofferdams at hydro power project CAR_01
- coffer_dam_destruction at a hydro power plant - CAR
- GP31 2012 Hydro Power in Brazil
- IMIA WGP 000(98-1) Hydro-Electric Power - 16-71
landslides
No results found.
modular construction
new technologies
- IMIA WGP 095(16) - Supercritical-boilers-v4
- 2007 Presentation of WG Paper 52 (07) Emerging Technologies
- 2010 Presentation of WGP 67 - Fast Developing Technology
- SP19 2010 Powering Change - Post Magazine - 22 11 10
- EP37-2009 Technological Innovation and Insurance Support
- EP34-2008 German Version of WGP 58 (08) CO2-free Coal Combustion
- IMIA WGP 000(98-3) Defects Liability Cover, Construction Insurance - 06-59
- IMIA WGP 015 (01) The Role of the Engineer in the Future of Engineering Insurance
- IMIA WGP 052 (07) Insuring Emerging Technologies
- IMIA WGP 058 (08) CO2 Free Coal Combustion Technology
- IMIA WGP 067 (10) Fast developing Technology
nuclear power plants
offshore wind farms
- Wind Turbine lightning and hail losses 2010
- 2006 present Off Shore risks (Item 11)
- EP52_2014 Offshore Code of Practice vds_3549 English
- EP52_2014 Offshore Code of Practice vds_3549 German
- 2014 present Introduction to new Offshore Code of Practice
- EAR losses to offshore wind farm_2007_14
- SP25 2012 Offshore Wind Analysis - GenRe
oil gas industry
ore processing
other production plants
- cracks in ice cream making plant_2007_34
- Electric solenoid coil in chicken hatchery_2007_33
- implosion of heat storage vessel_2007_32
- Wheat Silo Collapse_2007_29
- steam leak damaged sulphuric_acid plant
- floodwater_damage to electrical and electronic equipment
- collapse of grain silo
- Sawmill during extension works_2008_18
- SP03 2008 Solar Module Production
power plants turbines
- MB Sayano Hydro Power accident 2009
- EAR-DSU due to condenser tubes bursting
- SP28 2018 - RISK ASSESSMENT - ICS_SCADA SECURITY PROPERTY ENGINEERING POWER ENERGY
- 2010 present Managing Engineering risks (K Nix)
- IMIA WGP 091(15) CCPP Combined Cycle Power Plants
- GP33 2013 ALOP Claims Case - Air Preheater
- failure of power transformer_2007_35
- blade damage in compressor of gas turbine_2007_31
- blades damaged in gas_turbine
- loss of blades in steam_turbine
- crack in a Kaplan turbine blade
- Rotor of a gas turbine_2008_16
- mudslide damages hydro power plant
- bucket_wheel excavator during erection
- heavy_duty_gas_turbine
- GP31 2012 Hydro Power in Brazil
- GP18 2010 Managing Risks in a Power Company
- EP34-2008 German Version of WGP 58 (08) CO2-free Coal Combustion
- EP29-2008 Oil-insulated Power Transformers
- EP14-2003 Life Cycle Management - Utility Transformers
- EP12-2003 Turbine Optimisation to manage Breakdown Risk
- EP08-2003 Condition Monitoring for new Gas Turbines
- EP06-2003 What is Asset Management (Power Generation)
- IMIA WGP 000(93-1) Development of Industrial Gas Turbines - 06-59
- IMIA WGP 000(98-1) Hydro-Electric Power - 16-71
- IMIA WGP 000(98-2) Trends in Gas Turbine Performance - 16-70
- IMIA WGP 013 (00) Large Gas Turbines
- IMIA WGP 024 (02) Machinery Breakdown Risks of Nuclear Power Plants
- IMIA WGP 020 (02) Integrated Gasification Combined Cycle Power Projects / IGCC
- IMIA WGP 042 (05) Maintenance and Overhaul of Steam Turbines
- IMIA WGP 058 (08) CO2 Free Coal Combustion Technology
- IMIA WGP 064 (09) Combustion Turbines: Critical Losses and Trends
- IMIA WGP 075 (12) Construction of new Nuclear Power Plants
- IMIA WGP 074 (12) Contracted Power Generation Agreements
pulp and paper
- 2006 present Hazards in the Pulp and Paper Industry f
- Explosion in odorous gas collection system_2007_26
- Crack on Yankee dryer_2007_25
- Broken gear case of lime kiln_2007_24
- cracked lime kiln_2007_23
- broken chipper in paper mill_2007_22
- explosion in the dissolving tank of black liquor boiler_2007_21
- overheated lime kiln_2007_20
- damage to steam turbine in paper mill_2007_19
- guide roll caused damage to paper machine cylinders_2007_18
- explosion in recovery boiler_2007_17
- bearing failure on drying cylinder of paper machine_2007_16
- overheating damage_lime_kiln
- disruption of_steam_roll
- Collapse of pulp tower_2007_15
- IMIA WGP 049 (06) Hazards in Paper and Pulp Industries
railways other transportation systems
- 2000 present Internat public transport projects
- 2000 present IABSE - Urban Transportation
- Broken track cable of cable car_2008_1
- Damage to rail bed service machine_2007_4
- Fire damage to loco diesel engine_2007_3
- damage_highspeed_train during testing
- Metro tunnel flooded - CAR_2007
- GP25 2011 The Noord-Zuidijn Metro Tunnel Amsterdam
- SP22 2011 Insuring Mountain Rail etc. in Switzerland
- SP20 2010 Progress made in Gotthard Tunnel - Dec 2010
- SP13 2010 Marmaray Project, Istanbul
- EP15-2003 Gotthard Tunnel Railway Line
- EP03_2002 Risk Identification, Evaluation and Management - Public Transportation Projects
- IMIA WGP 032 (03) Highspeed Railway Construction Projects
renewable energy
- IMIA WGP 127 (22) Insuring Hydrogen Infrastructure
- Hydrogen Presentation_June 2022
- IMIA Insight Hydrogen
- EP58 - Risk Control Practice Renewable Energy Handbook February 2021
- 2021 02 - Handbook Renewable Energy (2)
- wind turbine losses_2007_28
- EAR losses to offshore wind farm_2007_14
- tornado damage to wind turbine_2005_12
- GP20 2010 Innovative Solution for Managemt of Climate Change
- GP17 2010 Renewable Energies
- SP25 2012 Offshore Wind Analysis - GenRe
- SP19 2010 Powering Change - Post Magazine - 22 11 10
- SP03 2008 Solar Module Production
- EP43-2009 Wind turbines - Fire protection - vds 3523
- EP20-2003 Lecture on Fuel Cells
- EP18-2004 Renewable Endergies
- EP11-2003 The Changing Face of Windpower
- IMIA WGP 000(99-4) Insurance of Wind Turbines
residential buildings
roads
- 2006 present Road Construction 12
- 2015 present Collapse Motorway Tihuana 2015 - Kolbe
- 2014 Presentation of WGP 87(14) Access Roads
- Landslide damaged motorway during maintenance - CAR_2009_36
- heavy rain causes road collapse - CAR_2007_26
- Road collapse - CAR_2007
- Landslide caused damage to road - CAR_2007
- street_subsided near_pond - CAR
- SP11 2009 Settlement of Hangslide Claim
- IMIA WGP 046 (06) Exposures related to the Construction of Roads
semiconductor plants
solar cells
steam turbines
- Maintenance and Overhaul of Steam Turbines
- 2005 Presentation Maintenance_of_steam_turbines
- Steamturbine disruption in refuse burning power plant_2011_37
- damage to steam turbine in paper mill_2007_19
- loss of blades in steam_turbine
- EP30-2008 Assessment of Turbogenerator Risk Levels
- EP12-2003 Turbine Optimisation to manage Breakdown Risk
- EP05-2003 Non-destructive Examination of Turbines and Generators - NDT
- IMIA WGP 042 (05) Maintenance and Overhaul of Steam Turbines
steel plants
thermal power plants
- 2013 present ALOP Claims Case - Air Preheater
- IMIA WGP 095(16) - Supercritical-boilers-v4
- GP33 2013 ALOP Claims Case - Air Preheater
- loss of blades in steam_turbine
- Faulty material or workmanship at boiler_2008_17
- Explosion_in_precipitator
- Collapse of chimney - CAR_2009_37
- EP34-2008 German Version of WGP 58 (08) CO2-free Coal Combustion
- IMIA WGP 058 (08) CO2 Free Coal Combustion Technology
transformers
- Short-circuit of a transformer_2009_36
- failure of power transformer_2007_35
- short circuit in power transformer_2007_30
- locomotive_traction transformers
- damage of gas turbine generator transformer
- SP21 2011 Repair of Arc furnace Transformer
- EP42-2009 Equisales Associates - Transformer Case Study
- EP29-2008 Oil-insulated Power Transformers
- EP21-2004 Analysis of Transformer Failures (2)
- EP14-2003 Life Cycle Management - Utility Transformers
- EP09-2003 Failure Analysis of Transformers
- IMIA WGP 000(96-1) Failure of Large Oil Cooled Transformers - 16-66
- IMIA WGP 033 (03) Analysis of Transformer Failures
transmission lines
tunnel boring machines
tunnelling and mining
- IMIA-WGP-114-19-Underground-Exposures-for-Hydroelectric-Plants
- 2011 present Tunnelling under Amsterdam Schippers+Wiggers
- 2011 present Design problems in tunnelling - advanta
- 2010 present Cologne tunnel collapse s
- 2009 present Marmaray Tunnel Project
- 2006 present ALOP-DSU tunnelling risks
- SP26 2015 Tunnel Insurance - Facts & Trends (November 2015)
- 2015 present Tunnel Emisora Oriente 2015 - de la Mora
- IMIA WGP 000(90-1) - The Channel Tunnel 16-54
- IMIA WGP 000(92-4) Channel Tunnel Update 16-57
- EP51_2014 Unpredictible Ground Conditions by S Artopoulos
- LEG Tunnel Works Clause Key Facts Doc June 2014
- LEG Tunnel Works Clause June 2014
- ITIG Example Endorsement re TCoP (draft of 01 05 2012)
- ITIG Tunnelling Code of Practice revised - 01_05_2012
- flooded sewage tunnel collapsed - CAR_2007_27
- Metro tunnel flooded - CAR_2007
- tunnel_collapse - CAR
- subway_tunnel_collapse - CAR
- Waste water tunnel_distortion - CAR
- tunnel_boring destroys buildings due to collapse - CAR
- GP25 2011 The Noord-Zuidijn Metro Tunnel Amsterdam
- GP24 2011 The Tunnelling Industry following Intro of the TCoP
- GP22 2011 Design Cover for unforeseen Ground Conditions
- GP19 2010 Colognes Tube Tunnel Disaster
- SP24 2012 Two Tunnelling Projects in the USA
- SP20 2010 Progress made in Gotthard Tunnel - Dec 2010
- SP13 2010 Marmaray Project, Istanbul
- SP04 2008 Update on Tunnelling CoP
- EP35-2009 French Version of the Tunnelling CoP
- EP27-2007 Russian Version of the Tunnelling CoP
- EP26-2007 German Version of the Tunnelling CoP
- EP24S-2006 Spanish Version of the Tunnelling C o P
- EP24-2006 Code of Practice for Risk Management of Tunnelling Works
- EP22-2005 Tunnel Safety - Where are we now
- EP15-2003 Gotthard Tunnel Railway Line
tunnelling code of practice
- EP62 A CODE OF PRACTICE FOR RISK MANAGEMENT OF TUNNEL WORKS - 3rd Edition, Feb 2023
- 2005 present Tunnel Code of Practice
- SP26 2015 Tunnel Insurance - Facts & Trends (November 2015)
- ITIG Example Endorsement re TCoP (draft of 01 05 2012)
- ITIG Tunnelling Code of Practice revised - 01_05_2012
- GP24 2011 The Tunnelling Industry following Intro of the TCoP
- SP04 2008 Update on Tunnelling CoP
- EP35-2009 French Version of the Tunnelling CoP
- EP27-2007 Russian Version of the Tunnelling CoP
- EP26-2007 German Version of the Tunnelling CoP
- EP24S-2006 Spanish Version of the Tunnelling C o P
- EP24-2006 Code of Practice for Risk Management of Tunnelling Works
- EP22-2005 Tunnel Safety - Where are we now
waste treatment
- 2009 present Waste to Energy Presentation
- EP53-swiss-re-municipal-waste-treatment-plants-1997-04
- IMIA WGP 000(95-3) - Waste Incinerators - Analysis of questionnaire and losses 16-64
- IMIA WGP 000(93-3) - Waste Incineration 16-58
- Steamturbine disruption in refuse burning power plant_2011_37
- waste treatment plant corroded at semiconductor plant
- GP13 2009 Waste to Energie - Opportunities + Challenges
- IMIA WGP 016 (01) Construction and Operation of Environmental Plant and Equipment
water supply and waste water works
wet risks
- 2007 Presentation of WG Paper 50 (07) - Exposure to Wet Risks
- drainage_culvert flooded - CAR
- Bored pile wall tilted at harbour construction - CAR_2008_31
- outfall structure damaged at harbour constr - CAR_2008_29
- storm damages tetrapods at harbour protection - CAR_2008_28
- GP23 2011 The Maasvlakte Harbour Project
- IMIA WGP 050 (07) Exposure related to Wet Risks
wind turbines
- Claims 1999 MB Wind Farm Gears
- Wind Turbine lightning and hail losses 2010
- Various Wind Turbine Fire losses
- Collected Wind Turbine breakdown losses 2010
- EP52_2014 Offshore Code of Practice vds_3549 English
- EP52_2014 Offshore Code of Practice vds_3549 German
- wind turbine losses_2007_28
- EAR losses to offshore wind farm_2007_14
- tornado damage to wind turbine_2005_12
- SP25 2012 Offshore Wind Analysis - GenRe
- EP43-2009 Wind turbines - Fire protection - vds 3523
- EP18-2004 Renewable Endergies
- EP11-2003 The Changing Face of Windpower
- IMIA WGP 000(99-4) Insurance of Wind Turbines