outfall structure damaged at harbour constr – CAR_2008_29
Bored pile wall tilted at harbour construction – CAR_2008_31
Defective grout of foundation for bridge pylons – CAR_2008_32
Faulty material or workmanship at boiler_2008_17
damage to steam turbine in paper mill_2007_19
Flood_damage to cofferdams at hydro power project CAR_01
Coffer dam overtopped – CAR_2007
Metro tunnel flooded – CAR_2007
Heavy rain causes road collapse – CAR_2007_26
Flooded sewage tunnel collapsed – CAR_2007_27
Drainage_culvert flooded – CAR
Plant and equipment washed into river bed
SP06 2008 Fire Loss during Building Construction
GP13 2009 Waste to Energie – Opportunities + Challenges
fire_damage_at office block – CAR
fire_damage_at hotel complex – CAR
Cross liability claim due fire_damage – CAR_01
formwork fire at_bridge construction – CAR
fire damage to condominium – CAR
fire_damage to refractory lining od IGCC Power Plant_02
Fire during repair work on polypropylene pipes
fire_in chemical_vapour deposition system
Sawmill during extension works_2008_18
fire in filament yarn production plant_2010_23
Fire damage to loco diesel engine_2007_3
Steamturbine disruption in refuse burning power plant_2011_37
SP16 2010 Fire and Explosion in Particle board factory
Explosion in particle board factory_2010_3
explosion of steam pressure vessel
explosion in recovery boiler_2007_17
explosion in the dissolving tank of black liquor boiler_2007_21
Explosion in odorous gas collection system_2007_26
Steamturbine disruption in refuse burning power plant_2011_37
coffer_dam_destruction at a hydro power plant – CAR
street_subsided near_pond – CAR
coffer dam overtopped – CAR_2007
Metro tunnel flooded – CAR_2007
retension wall of quay damaged – CAR_2008_30
Bored pile wall tilted at harbour construction – CAR_2008_31
Breakdown of bridge deck during launching ops – CAR_2009_34
Collapse of girder during bridge construction – CAR_2009_35
drainage_culvert flooded – CAR
bucket_wheel excavator during erection
locomotive_traction transformers
SP17 2010 Collapse of Cooling Tower
GP19 2010 Colognes Tube Tunnel Disaster
tunnel_boring destroys buildings due to collapse – CAR
Metro tunnel flooded – CAR_2007
heavy rain causes road collapse – CAR_2007_26
flooded sewage tunnel collapsed – CAR_2007_27
Breakdown of bridge deck during launching ops – CAR_2009_34
Collapse of girder during bridge construction – CAR_2009_35
Collapse of chimney – CAR_2009_37
Metro bridge collapse and crane failture – CAR_2010_38
water_reservoir_collapse damages IGCC power plant project
Collapse of pulp tower_2007_15
Storm damages tetrapods at harbour protection – CAR_2008_28
Oil storage tanks due to storm
Tornado damage to wind turbine_2005_12
EAR losses to offshore wind farm_2007_14
2006 Hotel Construction in the Caymans (hurricane)
Hurricane loss to a Hotel Project
IMIA WGP 000(96-3) – Design for earthquake and Wind -12-19
IMIA WGP 050 (07) Exposure related to Wet Risks
IMIA WGP 038 (04) Impact of increasing Natural Hazards
IMIA WGP 000(99-1) Catastroph Modelling
EP17-2003 Loss Potential of Natural Hazards
EP28-2007 Study of environmental change + global warming
SP15 2010 Earthquake Chile Feb 2010
Flood_damage to cofferdams at hydro power project CAR_01
Hurricane damage to hotel project – CAR_2006
Landslide caused damage to road – CAR_2007
Heavy rain causes road collapse – CAR_2007_26
Storm damages tetrapods at harbour protection – CAR_2008_28
Oil storage tanks due to storm
Tornado damage to wind turbine_2005_12
Plant and equipment washed into river bed
Flood loss at semiconductor plant_2009_2
Floodwater_damage to electrical and electronic equipment
2006 Hotel Construction in the Caymans (hurricane)
2007 Nakajima Global warming modelling
Hurricane loss to a Hotel Project
IMIA WGP 000(94-3) – Natural Hazards and Engineering Ins 12-18
2015 present Cat exposure to buildings 2015 – Reinoso s