SP17 2010 Collapse of Cooling Tower
Earth failure in high voltage generator
floodwater_damage to electrical and electronic equipment
guide_rolls_+ steam cylinders of paper machine
crack in a Kaplan turbine blade
damage of gas turbine generator transformer
locomotive_traction transformers
steam leak damaged sulphuric_acid plant
cracked_rotor of bulb turbine generator
explosion of steam pressure vessel
loss of blades in steam_turbine
overheating of fire tube boiler
bearing failure on drying cylinder of paper machine_2007_16
explosion in recovery boiler_2007_17
guide roll caused damage to paper machine cylinders_2007_18
damage to steam turbine in paper mill_2007_19
explosion in the dissolving tank of black liquor boiler_2007_21
broken chipper in paper mill_2007_22
Broken gear case of lime kiln_2007_24
Explosion in odorous gas collection system_2007_26
Damage to drying tumbler in chipboard factory_2007_27
short circuit in power transformer_2007_30
blade damage in compressor of gas turbine_2007_31
implosion of heat storage vessel_2007_32
Electric solenoid coil in chicken hatchery_2007_33
cracks in ice cream making plant_2007_34
failure of power transformer_2007_35
Short-circuit of a transformer_2009_36
Steamturbine disruption in refuse burning power plant_2011_37
Description of Machinery Insurance MB
MB Damage in a Reverse Osmosis desalination plant
1996 present Aging Plant Impact on MB Insurance s
1999 present Aging Plant review
IMIA WGP 028 (03) Risk Management Approaches in CAR/EAR Projects
IMIA WGP 000(99-2) Managing Risks in Construction Insurance
IMIA WGP 000(93-2) New Aspects of PML Estimation in CAR/EAR – 06-28
EP31-2008 Insuring Project and Contract Works (1)
EP32-2008 Insuring Project and Contract Works (2)
EP33-2008 Safety on Construction Sites
EP45-2011 Systemic Causes in Geotechnical Works
EP47-2012 Building Construction PML Paper
SP02 2008 TPL Risk evaluation for Contract Works
GP27 2011 Risk Engineering for construction projects
coffer_dam_destruction at a hydro power plant – CAR
fire_damage_at office block – CAR
fire_damage_at hotel complex – CAR
flood_damage to cofferdams at hydro power project CAR_01
tunnel_boring destroys buildings due to collapse – CAR
Waste water tunnel_distortion – CAR
cross liability claim due fire_damage – CAR_01
settlement damage_to_business_center TPL – CAR
terrorist_attack to office building – CAR
street_subsided near_pond – CAR
formwork fire at_bridge construction – CAR
hurricane damage to hotel project – CAR_2006
coffer dam overtopped – CAR_2007
fatal injury TPL at residential building – CAR_2005
Metro tunnel flooded – CAR_2007
Landslide caused damage to road – CAR_2007
heavy rain causes road collapse – CAR_2007_26
flooded sewage tunnel collapsed – CAR_2007_27
storm damages tetrapods at harbour protection – CAR_2008_28
outfall structure damaged at harbour constr – CAR_2008_29
retension wall of quay damaged – CAR_2008_30
Bored pile wall tilted at harbour construction – CAR_2008_31
Defective grout of foundation for bridge pylons – CAR_2008_32
damage to temporary bridge support – CAR_2008_33
Breakdown of bridge deck during launching ops – CAR_2009_34
Collapse of girder during bridge construction – CAR_2009_35
Landslide damaged motorway during maintenance – CAR_2009_36
Collapse of chimney – CAR_2009_37
Metro bridge collapse and crane failture – CAR_2010_38
drainage_culvert flooded – CAR
fire damage to condominium – CAR
Description of Contractors All Risks insurance CAR
Description of Comprehensive Project insurance CPI
IMIA WGP 081 (13) Annual Construction Policies
2017 present Financial Evaluation of Contract Parties Working Robertson 2017
EP55n Non-Proportional Premium Rating Method for Construction Risks (Abramson) 30-04-2018
IMIA WGP 028 (03) Risk Management Approaches in CAR/EAR Projects
IMIA WGP 000(93-2) New Aspects of PML Estimation in CAR/EAR – 06-28
EP31-2008 Insuring Project and Contract Works (1)
EP32-2008 Insuring Project and Contract Works (2)
EP33-2008 Safety on Construction Sites
SP02 2008 TPL Risk evaluation for Contract Works
GP27 2011 Risk Engineering for construction projects
water_reservoir_collapse damages IGCC power plant project
overheating_motors at ore processing plant testing
fire_damage to refractory lining od IGCC Power Plant_02
Fire during repair work on polypropylene pipes
fire_in chemical_vapour deposition system
crane hits power cable of existing semiconductor plant
damage_highspeed_train during testing
waste treatment plant corroded at semiconductor plant
bucket_wheel excavator during erection
oil storage tanks due to storm
mudslide damages hydro power plant
tornado damage to wind turbine_2005_12
stepper machine dropped during unloading_1999_13
EAR losses to offshore wind farm_2007_14
Collapse of pulp tower_2007_15
Rotor of a gas turbine_2008_16
Faulty material or workmanship at boiler_2008_17
Sawmill during extension works_2008_18
pipe rack due to impact at IGCC power plant_2009_19
Damage to boiler and evaporator frame_2009_22
fire in filament yarn production plant_2010_23
Description of Mechanical Erstion All Risks insurance EAR
IMIA WGP 081 (13) Annual Construction Policies