Working Group Papers
WGP 133 (24) Use of risk registers in Major Projects Presentation
WGP 134 (24) Construction and operation of semi-conductor plants Presentation
IMIA Working Group WGP 135 (24) EVBMP Presentation_Andy Kane
IMIA Working Group 133(24) The use of Risk Registers in Major Projects Final (002)_PAPER
IMIA WORKING GROUP WGP 131 (23) FLOATING OFFSHORE WIND: RISK MANAGEMENT & INSURANCE – PAPER
IMIA WGP 131 (23) – Floating Offshore Wind: Risk Management and Insurance
IMIA WGP (129) 22 Mass Timber PAPER
IMIA WGP 126 (22) Coating Failures
IMIA WGP (129) 22 No pictures_paper
IMIA WGP 127 (22) Insuring Hydrogen Infrastructure
IMIA WGP 124 (21) Modular Construction
IMIA WGP 121 (20) Risks Associated with New Materials
IMIA WGP 117(19) – Best practice in presentation of Engineering Risks to Underwriters
IMIA WGP 115 (19) Construction to Operational Insurance
IMIA-WGP-114-19-Underground-Exposures-for-Hydroelectric-Plants
IMIA WGP 113 (19) Cover for Existing Property
IMIA WGP 112 (19) Battery Storage
IMIA WGP 62 (09) Wind Energy final 121009 Paper
IMIA WGP 111 (18) Ageing Plant and Maintenance
IMIA WGP 110 (18) – Electrical Failures renumbered
IMIA WGP 108_9 (18) – Scientific Instruments 24 July 2018
IMIA WGP 107 (18) offshore platforms 08 08 2018 (3)
IMIA WGP 106 (18) Construction in Mountainous Regions FINAL
IMIA WGP 105 (17) – Adequacy of Sum Insured Final
IMIA WGP 103(17) – Diesel Engines Fin
IMIA WGP 102 (17) – Rolling Stock_FV_
IMIA WGP 100(16) – Excavations Support-03-11-2016-with-addition
IMIA WGP 099 (16)-Nat-cat-modelling-for-constr-projects-final
IMIA WGP 098(16) – Cyber-risks
IMIA WGP 097(16) -Construction-plant-and-equipment-v3-final-004
IMIA WGP 095(16) – Supercritical-boilers-v4
IMIA WGP 091(15) CCPP Combined Cycle Power Plants
IMIA WGP 091(15) CCPP Combined Cycle Power Plants
IMIA WGP (085) 14-Biomass-Power-Plants-.c
IMIA WGP 083 (13) How can Engineering Insurers help reduce Loss
IMIA WGP 081 (13) Annual Construction Policies
WGP 66 (10) Inland Transit Presentation
IMIA WGP 075 (12) Construction of new Nuclear Power Plants
IMIA WGP 074 (12) Contracted Power Generation Agreements
IMIA WGP 068 (10) Project Insurance involving Second Hand Plant and Machinery
IMIA WGP 067 (10) Fast developing Technology
IMIA WGP 065 (10) Construction of Petrochemical, Oil and Gas Processing Plants
IMIA WGP 064 (09) Combustion Turbines: Critical Losses and Trends
IMIA WGP 058 (08) CO2 Free Coal Combustion Technology
EP34-2008 German Version of WGP 58 (08) CO2-free Coal Combustion
IMIA WGP 057 (08) Desalination Plants
IMIA-WG57-08-Plantas-desalinizadoras-definitivo-JRG-a
IMIA WGP 054 (07) Water Distribution Systems in Buildings during Construction
IMIA WGP 053 (07) Rehabilitation Works and High Coverage Limits for Existing Property
IMIA WGP 052 (07) Insuring Emerging Technologies
IMIA WGP 050 (07) Exposure related to Wet Risks
IMIA WGP 049 (06) Hazards in Paper and Pulp Industries
IMIA WGP 046 (06) Exposures related to the Construction of Roads
IMIA WGP 044 (05) Design Exclusion Wordings (DE 1995 / LEG 1996)
IMIA WGP 043 (05) Theft of Construction Plant and Equipment
IMIA WGP 042 (05) Maintenance and Overhaul of Steam Turbines
IMIA WGP 039 (05) Steel Plants (Part 2) Loss Prevention Aspects
IMIA WGP 038 (04) Impact of increasing Natural Hazards
IMIA WGP 036 (04) Maintaining technical Expertise in the Insurance / Reinsurance Industry
IMIA WGP 035 (04) Monitoring of large CAR/EAR Projects
IMIA WGP 033 (03) Analysis of Transformer Failures
IMIA WGP 032 (03) Highspeed Railway Construction Projects
IMIA WGP 031 (03) Micro Gas Turbins, Risks and Markets
IMIA WGP 028 (03) Risk Management Approaches in CAR/EAR Projects
IMIA WGP 025 (02) Extension of the Period of Delay in Start Up Cover / DSU
IMIA WGP 024 (02) Machinery Breakdown Risks of Nuclear Power Plants
IMIA WGP 023 (02) Telecommunication and e-Commerce – Global Exposures
IMIA WGP 022 (02) Use of Non-destructive Testing / NDT
IMIA WGP 020 (02) Integrated Gasification Combined Cycle Power Projects / IGCC
IMIA WGP 016 (01) Construction and Operation of Environmental Plant and Equipment
IMIA WGP 015 (01) The Role of the Engineer in the Future of Engineering Insurance
IMIA WGP 014 (01) Inherent Defects Insurance – IDI
IMIA WGP 013 (00) Large Gas Turbines
IMIA WGP 012 (00) Internet & intranet – exposures and insurable interests
IMIA WGP 011 (00) AlOP Risk control and claims handling
IMIA WGP 008 (00) Human Factors in Engineering Risks
IMIA WGP 000(99-5) Claims arrising from Year 2000 Date
IMIA WGP 000(99-4) Insurance of Wind Turbines
IMIA WGP 000(99-2) Managing Risks in Construction Insurance
IMIA WGP 000(99-1) Catastroph Modelling
IMIA WGP 000(98-3) Defects Liability Cover, Construction Insurance – 06-59
IMIA WGP 000(98-2) Trends in Gas Turbine Performance – 16-70
IMIA WGP 000(98-1) Hydro-Electric Power – 16-71
IMIA WGP 000(97-5) Stress Corrosion Cracking 6-56
IMIA WGP 000(97-4) Fatigue in Engineering Insurance
IMIA WGP 000(97-3) Risk-based Managem for Equipm Reliability 9-32
IMIA WGP 000(97-2) Lenders Interest in Contractors Insurance – 06-55
IMIA WGP 000(97-1) Insurance of BOT Projects – 16-67
IMIA WGP 000(96-4) – Environmental Pollution Risks 12-20
IMIA WGP 000(96-3) – Design for earthquake and Wind -12-19
IMIA WGP 000(96-2) New Development in Advance Loss of Profits Insurance – 06-53
IMIA WGP 000(96-1) Failure of Large Oil Cooled Transformers – 16-66
IMIA WGP 000(95-4) – Computer Viruses + Implication on IMIA Mem16-65
IMIA WGP 000(95-3) – Waste Incinerators – Analysis of questionnaire and losses 16-64
IMIA WGP 000(95-1) – Political Risks in Eng Ins 6-52
IMIA WGP 000(94-5)- Fire Prevention for CAR-EAR
IMIA WGP 000(94-3) – Natural Hazards and Engineering Ins 12-18
IMIA WGP 000(94-2) – The broker’s role in Engineering Ins 9-29
IMIA WGP 000(94-1) – Performance Guarantee 6-50
IMIA WGP 000(93-5) – Industral All Risks Cover 6-49
IMIA WGP 000(93-4) – Advance Loss of Profits 6-48
IMIA WGP 000(93-3) – Waste Incineration 16-58
IMIA WGP 000(93-2) New Aspects of PML Estimation in CAR/EAR – 06-28
IMIA WGP 000(93-1) Development of Industrial Gas Turbines – 06-59
IMIA WGP 000(92-5) Garantee Insurances (mech-electrical)6-46
IMIA WGP 000(92-4) Channel Tunnel Update 16-57
IMIA WGP 000(92-3) Influence of Captives in Eng Ins 9-25
IMIA WGP 000(92-2) Fire prevention – Industrial Ins 6-47
IMIA WGP 000(92-1) Engineering Insurer vs Fire Insurer 9-27
IMIA WGP 000(91-2) – Loss of profits risks
IMIA WGP 000(91-1) Electronic Equipment Insurance Status
IMIA WGP 000(90-3) – All Risks Policies 6-42
IMIA WGP 000(90-2) – Repair Techniques 6-43
IMIA WGP 000(90-1) – The Channel Tunnel 16-54
Topics of IMIA Working Group Papers 1984 to present
IMIA WGP (070) 11 Photovoltaic-parks.c
IMIA WGP 094 (15) Construction of Stadiums_Paper