Selected Filters
Filter by category
Jack-up barge on the River Thames with a crawler crane to support lifting operations – By James Aubrey Robson
Site manager halting unauthorised and un-controlled hot works – By James Aubrey RobsonSite manager halting unauthorised and un-controlled hot works – By James Aubrey Robson
Heat exchanger unit aligned along a low point impacting installation- By James Aubrey Robson
Erection works on wind turbine 2012 Christoph Hoch
Device on wind turbine at -20 Cg Sweden 2013 Gernot Loeschenkohl
by Constantin Ene – Bucharest, Romania (s)
by Mustafa Öngel s
by Pawel Krok – Wolow, Poland s
by Tanner Johnson – Ames, Iowa, USA sImage 4 of 9
DCIM102MEDIADJI_0025.JPGImage