SP17 2010 Collapse of Cooling Tower

Earth failure in high voltage generator

floodwater_damage to electrical and electronic equipment

disruption of_steam_roll

guide_rolls_+ steam cylinders of paper machine

low water damage_to boiler_01

crack in a Kaplan turbine blade

damage of gas turbine generator transformer

locomotive_traction transformers

steam leak damaged sulphuric_acid plant

cracked_rotor of bulb turbine generator

overheating damage_lime_kiln

explosion of steam pressure vessel

loss of blades in steam_turbine

blades damaged in gas_turbine

overheating of fire tube boiler

bearing failure on drying cylinder of paper machine_2007_16

explosion in recovery boiler_2007_17

guide roll caused damage to paper machine cylinders_2007_18

damage to steam turbine in paper mill_2007_19

overheated lime kiln_2007_20

explosion in the dissolving tank of black liquor boiler_2007_21

broken chipper in paper mill_2007_22

cracked lime kiln_2007_23

Broken gear case of lime kiln_2007_24

Crack on Yankee dryer_2007_25

Explosion in odorous gas collection system_2007_26

Damage to drying tumbler in chipboard factory_2007_27

wind turbine losses_2007_28

Wheat Silo Collapse_2007_29

short circuit in power transformer_2007_30

blade damage in compressor of gas turbine_2007_31

implosion of heat storage vessel_2007_32

Electric solenoid coil in chicken hatchery_2007_33

cracks in ice cream making plant_2007_34

failure of power transformer_2007_35

Short-circuit of a transformer_2009_36

Steamturbine disruption in refuse burning power plant_2011_37

Description of Machinery Insurance MB

MB Damage in a Reverse Osmosis desalination plant

1996 present Aging Plant Impact on MB Insurance s

1999 present Aging Plant review

Claims 1999 MB Wind Farm Gears

MB Sayano Hydro Power accident 2009

IMIA WGP 028 (03) Risk Management Approaches in CAR/EAR Projects

IMIA WGP 000(99-2) Managing Risks in Construction Insurance

IMIA WGP 000(93-2) New Aspects of PML Estimation in CAR/EAR – 06-28

EP31-2008 Insuring Project and Contract Works (1)

EP32-2008 Insuring Project and Contract Works (2)

EP33-2008 Safety on Construction Sites

EP45-2011 Systemic Causes in Geotechnical Works

EP47-2012 Building Construction PML Paper

SP02 2008 TPL Risk evaluation for Contract Works

GP12 2009 Silent Risks

GP27 2011 Risk Engineering for construction projects

coffer_dam_destruction at a hydro power plant – CAR

fire_damage_at office block – CAR

fire_damage_at hotel complex – CAR

flood_damage to cofferdams at hydro power project CAR_01

tunnel_boring destroys buildings due to collapse – CAR

Waste water tunnel_distortion – CAR

cross liability claim due fire_damage – CAR_01

subway_tunnel_collapse – CAR

tunnel_collapse – CAR

settlement damage_to_business_center TPL – CAR

terrorist_attack to office building – CAR

street_subsided near_pond – CAR

parking_lot collapsed – CAR

formwork fire at_bridge construction – CAR

hurricane damage to hotel project – CAR_2006

coffer dam overtopped – CAR_2007

fatal injury TPL at residential building – CAR_2005

Metro tunnel flooded – CAR_2007

Landslide caused damage to road – CAR_2007

Road collapse – CAR_2007

heavy rain causes road collapse – CAR_2007_26

flooded sewage tunnel collapsed – CAR_2007_27

storm damages tetrapods at harbour protection – CAR_2008_28

outfall structure damaged at harbour constr – CAR_2008_29

retension wall of quay damaged – CAR_2008_30

Bored pile wall tilted at harbour construction – CAR_2008_31

Defective grout of foundation for bridge pylons – CAR_2008_32

damage to temporary bridge support – CAR_2008_33

Breakdown of bridge deck during launching ops – CAR_2009_34

Collapse of girder during bridge construction – CAR_2009_35

Landslide damaged motorway during maintenance – CAR_2009_36

Collapse of chimney – CAR_2009_37

Metro bridge collapse and crane failture – CAR_2010_38

drainage_culvert flooded – CAR

fire damage to condominium – CAR

Description of Contractors All Risks insurance CAR

Description of Comprehensive Project insurance CPI

2007 Presentation of WG Paper 53 (07) – Rehabilitation Works and High Coverage Limits for Existing Property

IMIA WGP 081 (13) Annual Construction Policies

2017 present Financial Evaluation of Contract Parties Working Robertson 2017

EP55n Non-Proportional Premium Rating Method for Construction Risks (Abramson) 30-04-2018

IMIA WGP 028 (03) Risk Management Approaches in CAR/EAR Projects

IMIA WGP 000(93-2) New Aspects of PML Estimation in CAR/EAR – 06-28

EP31-2008 Insuring Project and Contract Works (1)

EP32-2008 Insuring Project and Contract Works (2)

EP33-2008 Safety on Construction Sites

SP02 2008 TPL Risk evaluation for Contract Works

GP12 2009 Silent Risks

GP27 2011 Risk Engineering for construction projects

water_reservoir_collapse damages IGCC power plant project

overheating_motors at ore processing plant testing

fire_damage to refractory lining od IGCC Power Plant_02

Explosion_in_precipitator

Fire during repair work on polypropylene pipes

fire_in chemical_vapour deposition system

crane hits power cable of existing semiconductor plant

damage_highspeed_train during testing

waste treatment plant corroded at semiconductor plant

heavy_duty_gas_turbine

bucket_wheel excavator during erection

gas pipeline flooded

oil storage tanks due to storm

mudslide damages hydro power plant

tornado damage to wind turbine_2005_12

stepper machine dropped during unloading_1999_13

EAR losses to offshore wind farm_2007_14

Collapse of pulp tower_2007_15

Rotor of a gas turbine_2008_16

Faulty material or workmanship at boiler_2008_17

Sawmill during extension works_2008_18

pipe rack due to impact at IGCC power plant_2009_19

Damage to boiler and evaporator frame_2009_22

fire in filament yarn production plant_2010_23

Description of Mechanical Erstion All Risks insurance EAR

IMIA WGP 081 (13) Annual Construction Policies

Wind Turbine lightning and hail losses 2010

EAR-DSU due to condenser tubes bursting

EP15-2003 Gotthard Tunnel Railway Line

EP22-2005 Tunnel Safety – Where are we now

EP24-2006 Code of Practice for Risk Management of Tunnelling Works

EP24S-2006 Spanish Version of the Tunnelling C o P

EP26-2007 German Version of the Tunnelling CoP

EP27-2007 Russian Version of the Tunnelling CoP

EP35-2009 French Version of the Tunnelling CoP

SP04 2008 Update on Tunnelling CoP

SP13 2010 Marmaray Project, Istanbul

SP20 2010 Progress made in Gotthard Tunnel – Dec 2010

SP24 2012 Two Tunnelling Projects in the USA

GP19 2010 Colognes Tube Tunnel Disaster

GP22 2011 Design Cover for unforeseen Ground Conditions

GP24 2011 The Tunnelling Industry following Intro of the TCoP

GP25 2011 The Noord-Zuidijn Metro Tunnel Amsterdam

tunnel_boring destroys buildings due to collapse – CAR

Waste water tunnel_distortion – CAR

subway_tunnel_collapse – CAR

tunnel_collapse – CAR

Metro tunnel flooded – CAR_2007

flooded sewage tunnel collapsed – CAR_2007_27

ITIG Tunnelling Code of Practice revised – 01_05_2012

ITIG Example Endorsement re TCoP (draft of 01 05 2012)

LEG Tunnel Works Clause June 2014

LEG Tunnel Works Clause Key Facts Doc June 2014

EP51_2014 Unpredictible Ground Conditions by S Artopoulos

IMIA WGP 000(92-4) Channel Tunnel Update 16-57

IMIA WGP 000(90-1) – The Channel Tunnel 16-54

2015 present Tunnel Emisora Oriente 2015 – de la Mora

SP26 2015 Tunnel Insurance – Facts & Trends (November 2015)

2006 present ALOP-DSU tunnelling risks

2009 present Marmaray Tunnel Project

2010 present Cologne tunnel collapse s

2011 present Design problems in tunnelling – advanta

2011 present Tunnelling under Amsterdam Schippers+Wiggers

IMIA-WGP-114-19-Underground-Exposures-for-Hydroelectric-Plants

EAR-DSU due to condenser tubes bursting

IMIA WGP 074 (12) Contracted Power Generation Agreements

IMIA WGP 075 (12) Construction of new Nuclear Power Plants

IMIA WGP 064 (09) Combustion Turbines: Critical Losses and Trends

IMIA WGP 058 (08) CO2 Free Coal Combustion Technology

IMIA WGP 042 (05) Maintenance and Overhaul of Steam Turbines

IMIA WGP 020 (02) Integrated Gasification Combined Cycle Power Projects / IGCC

IMIA WGP 024 (02) Machinery Breakdown Risks of Nuclear Power Plants

IMIA WGP 013 (00) Large Gas Turbines

IMIA WGP 000(98-2) Trends in Gas Turbine Performance – 16-70

IMIA WGP 000(98-1) Hydro-Electric Power – 16-71

IMIA WGP 000(93-1) Development of Industrial Gas Turbines – 06-59

EP06-2003 What is Asset Management (Power Generation)

EP08-2003 Condition Monitoring for new Gas Turbines

EP12-2003 Turbine Optimisation to manage Breakdown Risk

EP14-2003 Life Cycle Management – Utility Transformers

EP29-2008 Oil-insulated Power Transformers

EP34-2008 German Version of WGP 58 (08) CO2-free Coal Combustion

GP18 2010 Managing Risks in a Power Company

GP31 2012 Hydro Power in Brazil

heavy_duty_gas_turbine

bucket_wheel excavator during erection

mudslide damages hydro power plant

Rotor of a gas turbine_2008_16

crack in a Kaplan turbine blade

loss of blades in steam_turbine

blades damaged in gas_turbine

blade damage in compressor of gas turbine_2007_31

failure of power transformer_2007_35

GP33 2013 ALOP Claims Case – Air Preheater

IMIA WGP 091(15) CCPP Combined Cycle Power Plants

2010 present Managing Engineering risks (K Nix)

SP28 2018 – RISK ASSESSMENT – ICS_SCADA SECURITY PROPERTY ENGINEERING POWER ENERGY

MB Sayano Hydro Power accident 2009